The Estepona Town Hall has announced the start of a project to install 1,250 linear meters of prefabricated concrete walkways designed to enhance beach access along the coastline.
This initiative aims to replace the existing wooden walkways, which had to be removed after each summer season and often sustained damage from storms. The new concrete paths will provide greater durability and withstand the wear from cleaning machinery, thereby reducing maintenance needs.
In addition, the concrete walkways will improve year-round accessibility for individuals with reduced mobility, connecting the promenade and coastal corridor to both dry and wet sand areas, as well as facilities such as restrooms and lifeguard stations. Notably, these new walkways will be wider than the current wooden versions, measuring 1.80 meters in width.
Furthermore, the project includes the installation of 80 units of slip-resistant, wood-like concrete decking near beach facilities, showers, and foot-washing stations. This project, which represents an investment of €414,304 (including VAT), is part of broader efforts to enhance beach amenities throughout the municipality.